<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: New program brings solar panels, and education, to schools</title>
	<atom:link href="http://www.eschoolnews.com/2011/03/30/new-program-brings-solar-panels-and-education-to-schools/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.eschoolnews.com/2011/03/30/new-program-brings-solar-panels-and-education-to-schools/</link>
	<description>Just another eSchool Media site</description>
	<lastBuildDate>Thu, 10 Jan 2013 16:37:10 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.4.2</generator>
	<item>
		<title>By: mgozaydin</title>
		<link>http://www.eschoolnews.com/2011/03/30/new-program-brings-solar-panels-and-education-to-schools/comment-page-1/#comment-1673</link>
		<dc:creator>mgozaydin</dc:creator>
		<pubDate>Thu, 31 Mar 2011 08:32:26 +0000</pubDate>
		<guid isPermaLink="false">http://www.eschoolnews.com/?p=60124#comment-1673</guid>
		<description>I am an engineer graduated from Stanford long time ago.
Phovoltaic panels are fine for renewable energy.

But evaluate the project very simply.
The amount of investment for solar panel      =  A
The total energy to be used in 5 years KWH  =  B

A / B  =  C     $ / KWH

If C is less than  0.10  $ / KWH

then it is good. I am afraid of its being  0.50  $/KWH . I hope not.
If anybody can tell me the    C  from any school I would appreciate it.
mgozaydin@hotmail.com</description>
		<content:encoded><![CDATA[<p>I am an engineer graduated from Stanford long time ago.<br />
Phovoltaic panels are fine for renewable energy.</p>
<p>But evaluate the project very simply.<br />
The amount of investment for solar panel      =  A<br />
The total energy to be used in 5 years KWH  =  B</p>
<p>A / B  =  C     $ / KWH</p>
<p>If C is less than  0.10  $ / KWH</p>
<p>then it is good. I am afraid of its being  0.50  $/KWH . I hope not.<br />
If anybody can tell me the    C  from any school I would appreciate it.<br />
<a href="mailto:mgozaydin@hotmail.com">mgozaydin@hotmail.com</a></p>
]]></content:encoded>
	</item>
	<item>
		<title>By: mgozaydin</title>
		<link>http://www.eschoolnews.com/2011/03/30/new-program-brings-solar-panels-and-education-to-schools/comment-page-1/#comment-3362</link>
		<dc:creator>mgozaydin</dc:creator>
		<pubDate>Thu, 31 Mar 2011 08:32:26 +0000</pubDate>
		<guid isPermaLink="false">http://www.eschoolnews.com/?p=60124#comment-3362</guid>
		<description>I am an engineer graduated from Stanford long time ago.
Phovoltaic panels are fine for renewable energy.

But evaluate the project very simply.
The amount of investment for solar panel      =  A
The total energy to be used in 5 years KWH  =  B

A / B  =  C     $ / KWH

If C is less than  0.10  $ / KWH

then it is good. I am afraid of its being  0.50  $/KWH . I hope not.
If anybody can tell me the    C  from any school I would appreciate it.
mgozaydin@hotmail.com</description>
		<content:encoded><![CDATA[<p>I am an engineer graduated from Stanford long time ago.<br />
Phovoltaic panels are fine for renewable energy.</p>
<p>But evaluate the project very simply.<br />
The amount of investment for solar panel      =  A<br />
The total energy to be used in 5 years KWH  =  B</p>
<p>A / B  =  C     $ / KWH</p>
<p>If C is less than  0.10  $ / KWH</p>
<p>then it is good. I am afraid of its being  0.50  $/KWH . I hope not.<br />
If anybody can tell me the    C  from any school I would appreciate it.<br />
<a href="mailto:mgozaydin@hotmail.com">mgozaydin@hotmail.com</a></p>
]]></content:encoded>
	</item>
</channel>
</rss>

<!-- Performance optimized by W3 Total Cache. Learn more: http://www.w3-edge.com/wordpress-plugins/

Page Caching using disk: enhanced

Served from: www.eschoolnews.com @ 2013-01-12 18:37:48 --